
The indoor unit installation
Installation Manual 13
ENGLISH
The indoor unit installation
Installation of Unit
Install the unit above the ceiling correctly.
CASE 1
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
(Unit: mm)
Dimension
Capacity
(kBtu/h)
A B C D E F G H I J
9
733 772 628 700 36 190 20 660 155 700
12/18
933 972 628 700 36 190 20 860 155 900
24
1133 1172 628 700 36 190 20 1060 155 1100
Ceiling Concealed Duct – Low Static
Ceiling Concealed Duct – Compact
(Unit:mm)
A B C D E F (G) H I J
18/24 K
932 882 355 46 450 30 87 750 163 260
Dimension
Capacity
Inspection
Port
Indoor Unit
Ceiling
Canvas
Duct
Air Intake
Port
Ceiling
Board
Ceiling Board
Air Discharge
Port
Discharge
Flexible Duct
Intake
Duct
A
B
CD
(G)
EF
body
filter
Joint canvas
Main duct
Drainage hole
Inspection
Port
Indoor Unit
Ceiling
Canvas
Duct
Air Intake
Port
Ceiling
Board
Ceiling Board
Air Discharge
Port
Discharge
Flexible Duct
Intake
Duct
H
I
J
1,MFL67939918,영영 17. 7. 3. 영영 11:31 Page 13
Commentaires sur ces manuels